Skip to content
Gulf Network Get a cost breakdown
Saadiyat Lagoons from the air: mangrove channels, flamingos, villa clusters running to the shoreline

Property guide · Dubai and Abu Dhabi

Saadiyat Lagoons by Aldar: villas and who can buy

Aldar's villas beside a nature reserve on Saadiyat Island: launched in 2022 for UAE nationals only, with a trail, nearby schools and an unconfirmed handover.

  • Dubai International Airport (DXB)about 114 minroad graph
  • Saadiyat Public Beachabout 11 minroad graph
  • Checked2026-09-12

Getting around

Drive times to the beach, school and airport

The community is not yet on the map, so times run from neighbouring Hidd Al Saadiyat; Muna British Academy is the nearest school, and every time is for a clear road.

  • Dubai International Airport (DXB)about 114 minroad graph

    118.7 kmstraight line in a straight line.

  • Saadiyat Public Beachabout 11 minroad graph

    3.3 kmstraight line in a straight line.

  • Muna British Academyabout 9 minroad graph

    4.6 kmstraight line in a straight line.

  • Saadiyat Beach / Saadiyat Public Beachabout 11 minroad graph

    3.3 kmstraight line in a straight line.

  • Zayed International Airport (AUH)about 29 minroad graph

    22.7 kmstraight line in a straight line.

  • Louvre Abu Dhabiabout 13 minroad graph

    7.5 kmstraight line in a straight line.

Get drive times

Plan of Saadiyat Lagoons from OpenStreetMap data, fetched 2026-09-25Saadiyat LagoonsSaadiyat BeachLouvreYas IslandReem Island
Plan drawn from OpenStreetMap data, © OpenStreetMap contributors

Living here

Mangrove villas inside a protected landscape

Villas in clusters across three zones, each with its own architecture, set in protected nature — but the launch terms were for UAE nationals only, and that is the first thing to check.

The brochure lists an eco-corniche, a linear park, an amphitheatre, courts, a climbing wall, an adventure park, an outdoor cinema, a farmers' market, mosques and three majlises, besides the schools, nurseries, shops and clinic. These counts come from the brochure and not from the release, so they are Aldar's plans of 2022 rather than a survey of what stands there today.

One line matters more than all of them. The launch release restricted the first community to UAE national buyers, and no primary document published since resolves the position for the phases now selling. We ask Aldar directly and tell you the answer before anything else, because on this community it decides whether there is anything to discuss.

Ask about schools

The outdoor cinema at Saadiyat Lagoons at sunset under a curved timber canopy
  • Villas, first phase207Aldar

    Released for sale on 3 November 2022 in four, five and six-bedroom formats. Aldar has published no total for the whole community.

  • Villa areas464.7 m²Aldar

    The four-bedroom; 544.6 m²Aldar the five and 591.4 m²Aldar the six, as internal saleable area on the brochure's floor plans of October 2022.

  • Who may buyStated at launch as UAE nationals only

    The launch release of 24 October 2022 says the first community was available exclusively to UAE national buyers, and the brochure repeats it. No primary source published since says whether that applies to the phases selling now, and a broker's page is not taken as one. Saadiyat is a designated investment zone, so where a sale is open to a foreign buyer it is freehold.

  • Protected land around itover 900,000 m²Aldar

    Aldar's figure for the protected nature surrounding the community, not the size of the community. The parcel Aldar bought in 2022, inside which it sits, is 6.2M m²Aldar — land, not project.

  • Trail5 kmAldar

    The waterfront trail on Aldar's master plan, with an eco-corniche, a linear park and a cultural spine named alongside it.

  • Water savingabout 50%Aldar

    Aldar's own claim at launch, alongside solar panels for water heating. It is a target stated in 2022, not a measured result, and the sustainability rating named with it is a target rather than a certificate.

  • Schools and nurseries3Aldar

    And 3Aldar nurseries, with 4Aldar retail and food hubs and 8Aldar grocery shops. These counts are in Aldar's brochure and in no release, so they are the developer's own.

Prices

Launch price from 2022, extras not included

Aldar's only published price is the first phase's starting price of October 2022, and by its own floor-plan note the pool, the garden pod and the lift are not included in it.

That note is not small print: it answers what a buyer gets for the money.

The phases on sale now have no published price. Name the phase and the format and we send what is asked today, with the date and the source of each figure, and the answer on who may buy.

  • First phase, at launch, fromAED 6.1MAldar

    Aldar's price in the launch release of 24 October 2022, for the first phase only. Aldar's own floor-plan disclaimer states that the pool, the garden pod and the lift are not included in the initial price.

  • Al Ghaf, Al Sidr and Ethirnot published

    Aldar's phase pages carry no readable price.

  • Payment plannot published

    Neither the launch release nor the brochure gives one; the schedules in circulation are brokers'.

New launches

Al Ghaf, Al Sidr and Ethir phases

Aldar lists Al Ghaf 1 and Al Ghaf 2, then Saadiyat Lagoons Phase 2 as Al Sidr and as Ethir; by the launch release of 24 October 2022 construction was to start in the second quarter of 2023 and handover to begin in the second quarter of 2026, and Aldar has confirmed neither since.

  • Other projects

    A project not listed here

    Name the phase. We ask the developer what is registered, what is released and who may buy it, and send the answer with the date it was given.

    Ask about a project
The water-play lagoon and eco-corniche of Saadiyat Lagoons from above, as rendered by Aldar

Sources

Aldar's release, brochure and live pages

Aldar's launch release of October 2022, its brochure with attribution and its live community pages; the regulator's site could not be reached on 12 September 2026.

  • Release

    Aldar's launch release, 24 October 2022

    The launch, the first phase, its formats, its starting price and the terms on who could buy it.

  • Brochure

    Aldar's Saadiyat Lagoons brochure, October 2022

    The villa areas, the amenity counts and the master plan, carried with attribution.

  • Developer, live

    Aldar's community and phase pages, read 12 September 2026

    The protected-land figure and the names of the phases now on sale.

  • Regulator

    ADREC

    Where a registered project's number and escrow account are published. Unreachable on 12 September 2026; to be checked again.

  • Documents

    The source documents

    We send the release, the brochure and the registry entry, current on the day you ask, with the lines used here marked.

    Get the documents

Questions

Ask about Saadiyat Lagoons

Tell us the format you want, and we send the developer's answer on who may buy, the phase that is selling and today's asking price with its date.

Any country code. We call back or write, whichever you prefer.